| Find over 500 more construction specifications | Arcat.com |
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||
. This section is based on the products of Newark Paperboard Products, which is located at: 20 Jackson Dr. Cranford, NJ 07016 Toll Free Tel: 800-777-7890 Email: request info Web: www.newarkgroup.com/businesses/conv_paper_bkgd.htm [ Click Here ] for additional information. The Newark Group, founded in 1912, is an integrated global producer of 100% recycled paperboard and paperboard products with significant manufacturing and marketing operations in North America and Europe. Over the course of our history, we've learned what it means to be a success, and products are just a part of that definition. | ||||||||||||||||||||||||||||||||||||||||||||||||||
| PART 1 | GENERAL | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | SECTION INCLUDES | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Cylindrical concrete forms. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | RELATED SECTION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Section 03050 - Basic Concrete Materials and Methods: Installation and requirements for cast in place concrete. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | REFERENCES | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | American Concrete Institute (ACI): ACI 301 - Specification for Structural Concrete. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | SUBMITTALS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Submit under provisions of Section 01300. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | [ Product Data ]: Manufacturer's data sheets on each product to be used, including: | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Preparation instructions and recommendations. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2. | Storage and handling requirements and recommendations. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3. | Installation methods. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | DELIVERY, STORAGE, AND HANDLING | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Store concrete forms in accordance with manufacturer's requirements. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Store concrete forms vertically, on end. If stored horizontally, tubes shall be level, supported their full length, and not less than 4 inches (101 mm) off the ground. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Store concrete forms in clean, dry area, under cover, and protected from heat and moisture. | |||||||||||||||||||||||||||||||||||||||||||||||||
| D. | Protect Poli-NewFrom concrete forms from exposure to direct sunlight. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | WARRANTY | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Manufacturer's standard limited warranty against material and manufacturing defects. | |||||||||||||||||||||||||||||||||||||||||||||||||
| PART 2 | PRODUCTS | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2.1 | MANUFACTURERS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Acceptable Manufacturer: Newark Paperboard Products, which is located at: 20 Jackson Dr. ; Cranford, NJ 07016; Toll Free Tel: 800-777-7890; Email: request info; Web: www.newarkgroup.com/businesses/conv_paper_bkgd.htm | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Substitutions: Not permitted. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Requests for substitutions will be considered in accordance with provisions of Section 01600. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2.2 | CYLINDRICAL CONCRETE FORMS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Concrete Forms: Paperboard tubes of spiral construction, fabricated for easy removal; NewForm or Poli-NewForm manufactured by The Newark Group, and as follows: | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Tube Wall Thickness: Sufficient to hold the full hydrostatic pressure of concrete in a single pour. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2. | Outer Tube Coating: Moisture and weather-resistant. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3. | Inner Tube Surface: Appropriate for required concrete finish and application, and as follows: | |||||||||||||||||||||||||||||||||||||||||||||||||
| a. | Strippable treatment not requiring release agents. | |||||||||||||||||||||||||||||||||||||||||||||||||
| b. | Polystyrene liner. | |||||||||||||||||||||||||||||||||||||||||||||||||
| c. | Non-strip inner tube finish. | |||||||||||||||||||||||||||||||||||||||||||||||||
| PART 3 | EXECUTION | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1 | INSTALLATION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Select concrete form appropriate for height and diameter of finish column, in accordance with manufacturer's instructions. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Remove dirt and debris before placing concrete form over steel reinforcing bars and before placing concrete. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Erect concrete form in accordance with ACI 301 and to support loads during construction. | |||||||||||||||||||||||||||||||||||||||||||||||||
| D. | Strip forms in accordance with manufacturer's recommendations, including the following. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Remove within 10 days after forming unless longer curing time is required. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2. | Use portable electric saw set to depth of form thickness to cut forms for removal. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3. | Make two or three evenly spaced cuts with portable saw before stripping forms. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.2 | PROTECTION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Protect concrete forms until completion of concrete cure. | |||||||||||||||||||||||||||||||||||||||||||||||||