Will save time by being able to strip the existing wall with hat channel and applying the panels over the top. No need to tear down the existing exterior unless structurally unstable.
Will save in labor costs by not needing a subcontractor to apply an EIFS or stucco system.
Will save in material costs over the EIFS or stucco system.
Can meet deadlines by working in any type of weather condition.