TYPAR Geosynthetics Load and Slope Stabilization Geotextiles
 
         
SECTION 31 05 19.13
 
         
LOAD AND SLOPE STABILIZATION GEOTEXTILES
 
         
 
         
Copyright 2013 - 2018 ARCAT, Inc. - All rights reserved

          ** NOTE TO SPECIFIER ** Typar Geosynthetics, TYPAR GeoCell - Load Support and Slope Protection system products.
.
This section is based on the products of Typar Geosynthetics, Brand of Berry Plastics, which is located at:
70 Old Hickory Blvd
Old Hickory, TN 37138
Phone: 1-800-541-5519
-Web Site: www.typargeosynthetics.com
E-mail: geosales@pginw.com
[click Here] for additional information.
Typar Geosynthetics, Brand of Berry Plastics, a global manufacturer of specialized nonwoven geosynthetics and netting solutions. With operations in the United States, United Kingdom, Australia and Germany, Fiberweb Geosynthetics supply products to over 60 countries worldwide.
Berry Plastics works with a wide range of industries and markets and commands an enviable reputation for offering quality and affordable products as well as tailor made solutions to unique requirements.
Berry Plastics has made a commitment to developing new products. This commitment forms an integral part of our core business objectives.
TYPAR GeoCell GS for Load Support transfer downward forces laterally, reducing loads on underlying soils. The cellular confinement system is an ideal solution for providing stabilization over poor soil conditions, reducing constructed profile depth and cost, protecting soil and roots from compaction, and providing site access for light, heavy, and industrial vehicles.
TYPAR GeoCell GS for Slope Protection improves resistance to erosive forces on steep, unstable, or slopes exposed to severe hydraulic or mechanical stresses. Variable cell depths and diameters provide cost-effective options for protection up to 1:1
 
          PART 1GENERAL
 
          1.1SECTION INCLUDES
          ** NOTE TO SPECIFIER ** Delete items below not required for project.
 
          A.Load Support Geotextiles for the following applications:
          1.Base Reduction
          2.Improved Access Over Poor Soils
          a.Unpaved Road Reinforcement.
          b.Paved Road Reinforcement.
          c.Tree Root Protection.
 
          B.Slope Protection Geotextiles for the following applications:
          a.Unpaved Road Reinforcement.
          b.Paved Road Reinforcement.
          c.Coastal and Waterways.
          d.Retaining Structures.
          e.Erosion Control.
          f.Landfill Separation.
 
          1.2RELATED SECTIONS
          ** NOTE TO SPECIFIER ** Delete any sections below not relevant to this project; add others as required.
 
          A.Section 31 20 00 - Earth Moving.
 
          B.Section 33 36 33 - Utility Septic Tank Drainage Field.
 
          C.Section 33 46 13.13 - Foundation Drainage Piping.
 
          D.Section 32 10 00 - Bases, Ballasts, and Paving.
 
          E.Section 32 30 00 - Site Improvements.
 
          F.Section 32 86 00 - Agricultural Irrigation.
 
          G.Section 32 90 00 - Planting.
 
          H.Section 32 92 13 - Hydro-Mulching.
 
          1.3REFERENCES
          ** NOTE TO SPECIFIER ** Delete references from the list below that are not actually required by the text of the edited section.
 
          A.ASTM D 1883 - Standard Test Method for CBR (California Bearing Ratio) of Laboratory-Compacted Soils.
 
          B.ASTM D 4491 - Standard Test Methods for Water Permeability of Geotextiles by Permittivity.
 
          C.ASTM D 4632 - Standard Test Method for Grab Breaking Load and Elongation of Geotextiles.
 
          D.ASTM D 4533 - Standard Test Method for Trapezoid Tearing Strength of Geotextiles.
 
          E.ASTM D 4751 - Standard Test Method for Determining Apparent Opening Size of a Geotextile.
 
          F.ASTM D 698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort
 
          G.AASHTO M288 - Standard Specification for Geotextile Specification for Highway Applications.
 
          H.DOT Standards - _________ State Department of Transportation Standard Specifications.
 
          I.U.S. Green Building Council, LEED Building Design and Construction (BD+C)Version 4.0 Rating System. (LEED v4.0)
 
          1.4SUBMITTALS
 
          A.Submit under provisions of Section 01 30 00 - Administrative Requirements.
 
          B.Product Data: Manufacturer's data sheets on each product to be used, including:
          a.Preparation instructions and recommendations.
          b.Storage and handling requirements and recommendations.
          c.Installation methods.
 
          C.Shop Drawings: Submit manufacturer's shop drawings including laying pattern and anchoring.
          ** NOTE TO SPECIFIER ** Delete the following paragraphs if LEED is not applicable.
 
          D.LEED Submittals: Provide documentation of how the requirements of Credit will be met:
          a.MR Credit 4.1 and 4.2 Recycled Content: List of proposed materials with recycled content. Indicate post-consumer recycled content and pre-consumer recycled content for each product having recycled content.
          b.MR Credit 5.1 and 5.2 Regional Materials: Product data and certification letter indicating percentages by weight of post-consumer and pre-consumer recycled content for products having recycled content.
 
          E.Samples: Submit manufacturers samples of each product specified.
 
          F.Manufacturer's Certificates: Certify products meet or exceed specified requirements.
 
          G.Closeout Submittals: Provide manufacturer's maintenance instructions that include recommendations for periodic checking and adjustment and periodic cleaning and maintenance of all components.
 
          1.5QUALITY ASSURANCE
 
          A.Manufacturer Qualifications: Manufacturer with a minimum for five years documented experience with the products specified and with ISO Certification certifying material compliance..
 
          B.Installer Qualifications: Installer experienced in performing work of this section that has specialized in installation of work similar to that required for this project. Installer must also be able to provide skilled workman with satisfactory record of performance on landscaping or paving projects of comparable size and quality.
 
          C.Preinstallation Meetings:
          a.Convene a preinstallation meeting a minimum of two weeks prior to start of work.
          b.Verify project requirements, subbase and base conditions, manufacturer's installation instructions and coordination with other related work.
          c.Require attendance of parties directly affecting work of this section, including the Contractor, engineer, installer, and manufacturer's representative.
          d.Comply with Division 1 requirements.
 
          1.6DELIVERY, STORAGE, AND HANDLING
 
          A.Store products in manufacturer's unopened packaging until ready for installation.
 
          B.Protect materials during handling and installation to prevent damage.
 
          1.7PROJECT CONDITIONS
 
          A.Maintain environmental conditions recommended by manufacturer for desired results. Do not install products under conditions outside manufacturer's absolute limits.
 
          B.In cold weather, do not use frozen materials or materials coated with ice or frost, and do not build on frozen base or wet, saturated or muddy subgrade.
 
          C.Protect partially completed work against damage from other construction traffic when work is in progress.
 
          1.8SEQUENCING
 
          A.Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
 
          PART 2PRODUCTS
 
          2.1MANUFACTURERS
 
          A.Acceptable Manufacturer: TYPAR Geosynthetics, which is located at: 9335 Harris Corners Pkwy.; Charlotte, NC 28269; Tel: 704-697-5100; Email: request info; Web: http://www.typargeosynthetics.com
          ** NOTE TO SPECIFIER ** Delete one of the following two paragraphs; coordinate with requirements of Division 1 section on product options and substitutions.
 
          B.Substitutions: Not permitted.
 
          C.Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 - Product Requirements.
          ** NOTE TO SPECIFIER ** Select the applications and geotextile(s) products required from the following paragraphs and delete the paragraphs not required. Coordinate the selections with the specification Sections for the systems where the products will be installed. Consult the manufacturer for additional recommendations.
 
          2.2APPLICATION - LOAD PROTECTION
 
          A.Geotextile Selection for Pedestrian/Light Vehicle Load Support:
          a.Typar GeoCell GS 250/100:
          1)Panel Size: 16 feet 4 inches by 23 feet.
          2)Cell Diameter: 9.8 inches
          3)Weight: 37.5 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          B.Geotextile Selection for Light Vehicle Load Support:
          a.Typar GeoCell GS 250/150:
          1)Panel Size: 16 feet 4 inches by 23 feet.
          2)Cell Diameter: 9.8 inches
          3)Weight: 55 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          C.Geotextile Selection for Heavy Vehicle Load Support:
          a.Typar GeoCell GS 220/200:
          1)Panel Size: 20 feet by 10 feet.
          2)Cell Diameter: 8.7 inches
          3)Weight: 44 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          2.3APPLICATION - SLOPE PROTECTION
 
          A.Geotextile Selection for Slopes up to 1:1:
          a.Typar GeoCell GS 250/100:
          1)Panel Size: 16 feet 4 inches by 23 feet.
          2)Cell Depth: 4 inches.
          3)Weight: 37.5 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          B.Geotextile Selection for Slopes up to 1:1:
          a.Typar GeoCell GS 250/150:
          1)Panel Size: 16 feet 4 inches by 23 feet.
          2)Cell Depth: 6 inches.
          3)Weight: 55 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          C.Geotextile Selection for Slopes up to 1:2:
          a.Typar GeoCell GS 350/100:
          1)Panel Size: 20 feet by 10 feet.
          2)Cell Depth: 4 inches.
          3)Weight: 24 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          D.Geotextile Selection for Slopes up to 1:2:
          a.Typar GeoCell GS 350/150:
          1)Panel Size: 20 feet by 10 feet.
          2)Cell Depth: 6 inches.
          3)Weight: 37.5 lbs.
          4)Material: Non-Woven PP/PE
          5)Color: Dark Gray.
 
          PART 3EXECUTION
 
          3.1EXAMINATION
 
          A.Do not begin installation until substrates have been properly prepared.
 
          B.Before beginning installation, verify site conditions are as indicated on the Drawings. Notify the Architect if site conditions are not acceptable. Do not begin preparation or installation until unacceptable conditions have been corrected.
 
          C.If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
          ** NOTE TO SPECIFIER ** Select "Load Support" and/or "Slope and Channel" Preparation and Installation from the following paragraphs as required for the project and delete the one note required.
 
          3.2LOAD SUPPORT PREPARATION
 
          A.Subgrade Preparation:
          ** NOTE TO SPECIFIER ** Coordinate the following paragraphs below with Typar Geosynthetics's recommendations and with subgrade requirements specified in Section 31 20 00 - Earth Moving Earthwork and, if required, Bases specified in Section 32 10 00 - Bases, Ballasts, and Paving, and Subdrainage Systems specified in Section 33 46 13.13 - Foundation Drainage Piping. Proper subgrade preparation and drainage is required to achieve required performance. Contact Typar Geosynthetics for additional recommendations.
          a.Prepare subgrade as specified in Section 31 20 00 - Earth Moving. Verify subgrade in accordance with porous paving system manufacturer's instructions.
          b.Ensure foundation soil meets minimum strength requirements through proof rolling or other conventional method. If unacceptable foundation soils are encountered, excavate and replace with suitable quality material.
 
          B.Separation Layer and Base Materials Installation:
          ** NOTE TO SPECIFIER ** Coordinate paragraphs below with Typar Geosynthetics recommendations and with base materials and installation provided as specified in Section 32 10 00 - Bases, Ballasts, and Paving. The strength of the porous pavement system is determined, in part, by the support provided by the sub-base. Consult with the manufacturer for engineered base details and thickness recommendations. Proper engineered base materials will promote vegetative growth and provide required structural support.
          a.When separation between subgrade soil and infill material is required, place TYPAR 3401G AASHTO Class 3 Geotextile over subgrade.
          b.If additional base materials or engineered soils are required between separation geotextile and TYPAR GEOCELL GS, install the appropriate depth and compact to a minimum 95 percent Standard Proctor.
          c.Install separation layer and base as specified in Section 32 10 00 - Bases, Ballasts, and Paving. Verify sub-base is installed in accordance with geotextile manufacturer's instructions.
          ** NOTE TO SPECIFIER ** Select the installation requirements for the products specified from the following paragraphs and delete the ones not required. Contact Typar Geosynthetics for additional information on installation requirements suitable for your projects requirements.
 
          3.3LOAD SUPPORT INSTALLATION
 
          A.Panel Placement and Connection:
          a.Position and expand TYPAR GEOCELL GS panels to the appropriate dimensions. Hold individual panels in their expanded positions with rebar J hook fixing pins or wooden stakes.
          b.Confirm each TYPAR GEOCELL GS panel is expanded uniformly and correctly aligned. Nest panels along each joint to ensure adjacent TYPAR GEOCELL GS panels are flush at joint and adjoining cells are fully anchored.
          c.Install rebar fixing pins or wooden stakes along the joining of each panel every other cell to hold TYPAR GEOCELL GS panels stable during infill. Alternate the installation of rebar fixing pins or wooden stakes to ensure each panel is stable.
 
          B.Exposed Aggregate or Engineered Infill
          a.Fill TYPAR GEOCELL GS with specified aggregate material progressively from front to back. Do not use an infill material with particle sizes greater than 3 inches.
          b.Overfill cells with aggregate infill material. Limit the drop height of infill material to 3 feet (1 meter) to avoid displacement of the cell walls.
          c.Overfill cells to a depth of approximately 2 inches (50 mm) and level for exposed aggregate surfaces. Maintain the 2 inch wear surface over TYPAR GEOCELL GS panels to prevent wear to the cell walls.
          d.Compact infill to a minimum of 95 percent Standard Proctor in accordance with ASTM D 698.
 
          C.Base Stabilization
          a.Overfill TYPAR GEOCELL GS to a depth of 1 inch and compact to a minimum of 95 percent Standard Proctor.
          b.Wear surface shall consist of asphalt/concrete/paver stones/other as specified or indicated on the Drawings. Install per Engineer's specifications.
 
          D.Unpaved Road Reinforcement: Install as specified in 02700.
 
          E.Paved Road Reinforcement: Install as specified in 02700.
 
          F.Industrial Yard Stabilization: Install as specified in 02700.
 
          G.Subsurface Drains: Install as specified in Section 33 46 13.13 - Foundation Drainage Piping.
 
          H.Erosion Control: Install as specified in 02920.
 
          I.Landfill Separation: Install as specified in 02700.
 
          J.Recreational Facilities: Install as specified in 02800.
 
          K.Septic system: Install as specified in 02540
 
          L.Landscaping: Install as specified in 02900
 
          3.4SLOPE AND CHANNEL PROTECTION PREPARATION
 
          A.Subgrade Preparation:
          ** NOTE TO SPECIFIER ** Coordinate the following paragraphs below with Typar Geosynthetics's recommendations and with subgrade requirements specified in Section 31 20 00 - Earth Moving Earthwork and, if required, Bases specified in Section 32 10 00 - Bases, Ballasts, and Paving, and Subdrainage Systems specified in Section 33 46 13.13 - Foundation Drainage Piping. Proper subgrade preparation and drainage is required to achieve required performance. Contact Typar Geosynthetics for additional recommendations.
          a.Prepare subgrade as specified in Section 31 20 00 - Earth Moving. Verify subgrade in accordance with porous paving system manufacturer's instructions.
          b.Excavate or fill foundation soils to align top of TYPAR GEO-CELL GS panels flush with or slightly lower than adjacent surface or final grade.
          c.Install TYPAR 3401G geotextile underlayer on prepared surfaces.
          d.If required, install geomembrane underlayer on prepared surfaces.
 
          3.5SLOPE AND CHANNEL INSTALLATION
 
          A.Panel Anchorage:
          a.Anchorage with Rebar J Hooks (No Crest Trench.)
          b.a. Position collapsed TYPAR GEOCELL GS panels at crest of slope.
          c.b. Drive the rebar J hooks at the crest of the slope to secure the TYPAR GEOCELL GS panels in place and allow expansion of the cellular confinement system into position.
          d.c. After the TYPAR GEOCELL GS panels are expanded as de- sired, drive the rebar J hooks with the arm of the hook over the cell wall and flush with top of panel.
          e.d. Anchor TYPAR GEOCELL GS with J hooks in each cell around the perimeter and every square yard.
 
          B.Panel Placement:
          a.Place compressed TYPAR GEOCELL GS panels at crest of slope and expand each panel down slope. Ensure each panel is expanded uniformly to required dimensions.
          b.Correctly align outer cells of each layer. Interleaf or overlap edges of adjacent Panels in each layer to nest connections. Verify each panel is level and flush with adjacent panel(s).
 
          C.Infill Placement:
          a.Place infill in expanded cells with suitable material handling equipment, such as a backhoe, front-end loader, conveyor, or crane-mounted skip.
          b.Limit drop height to a maximum of 3 feet (1 m) to avoid damage or displacement of the cell walls.
          c.Fill TYPAR GEOCELL GS panels from crest of slope to toe.
          d.Infill material shall be comprised of particle sizes no greater than 3 inches, unfrozen, and free-flowing when placed into the TYPAR GEOCELL GS Panels.
          e.Compact infill material in accordance with the Engineer's requirements.
          f.Ensure the infill material remains flush with the TYPAR GEO-CELL GS cell walls after compaction.
 
         
END OF SECTION