| Find over 500 more construction specifications | Arcat.com |
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||
. This section is based on the products of JJ Partners, Inc., which is located at: | ||||||||||||||||||||||||||||||||||||||||||||||||||
Grass Valley, CA 95949 Toll Free Tel: (800)700-1179 Tel: (530)268-2707 Fax: (530) 268-3376 Email: david@joistjackets.com Web: www.joistjackets.com [ Click Here ] for additional information. | ||||||||||||||||||||||||||||||||||||||||||||||||||
Joist Jackets®: A flashing system for deck framing. You spend time and money each year protecting the surface of your deck, but what about the areas that are most vulnerable to year-round damage from the elements? Contractors agree that they most often need to replace the structures below the surface of the deck--the wood joists. Ledger Jackets: A flashing system for ledges. Helps prevent deck rot, saves natural timber resources, easy to install, semi-rigid PVC is self-sealing, low cost, improves sound quality, maintenance free. | ||||||||||||||||||||||||||||||||||||||||||||||||||
| PART 1 | GENERAL | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | SECTION INCLUDES | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Self-sealing PVC flashing caps and covers for concealed ledgers, joists and framing members in exterior decking. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | RELATED SECTIONS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Section 06100 - Rough Carpentry. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Section 06150 - Wood Decking. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Section 06201 - Exterior Finish Carpentry. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | SUBMITTALS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Submit under provisions of Section 01300. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Product Data: Manufacturer's data sheets on each product to be used, including: | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Preparation instructions and recommendations. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2. | Storage and handling requirements and recommendations. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3. | Installation methods. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | DELIVERY, STORAGE, AND HANDLING | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Store products in manufacturer's unopened packaging until ready for installation. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Store product at ambient temperatures out of contact with the elements. Keep from contact with strong mineral acids and oxidizers. Dusts and/or particulate matter that may be generated during handling or processing should be cleaned up by vacuuming or wet mopping. | |||||||||||||||||||||||||||||||||||||||||||||||||
| PART 2 | PRODUCTS | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2.1 | MANUFACTURERS | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Acceptable Manufacturer: JJ Partners, Inc., which is located at: 18867 Brewer Rd. ; Grass Valley, CA 95949; Toll Free Tel: 800-700-1179; Tel: 530-268-2707; Fax: 530-268-3376; Email: request info; Web: www.jjpartnersinc.com | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Substitutions: Not permitted. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Requests for substitutions will be considered in accordance with provisions of Section 01600. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2.2 | DECK FLASHING | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Joist Jackets: Flexible self-sealing semi-rigid PVC extrusions by JJ Partners. Provide in width suitable for 2x, 4, and 6x framing as required for project. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Ledger Jackets: Flexible self-sealing semi-rigid PVC extrusions by JJ Partners. Provide in width suitable for 2x framing as required for project. | |||||||||||||||||||||||||||||||||||||||||||||||||
| C. | Fasteners: Staples. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2.3 | MATERIAL | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Flexible Semi-rigid PVC Extrusions: Polyvinylchloride compound of proprietary additives including plasticizers, stabilizers and inert fillers to enhance physical characteristics for product application performance. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Self-sealing of fastener penetration and fastener holes. | |||||||||||||||||||||||||||||||||||||||||||||||||
| PART 3 | EXECUTION | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1 | EXAMINATION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Do not begin installation until substrates have been properly prepared. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.2 | PREPARATION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Clean surfaces thoroughly prior to installation. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.3 | INSTALLATION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Install in accordance with manufacturer's instructions, including the following: | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1. | Pre-cut material to cover the top and ends of wood members. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2. | Staple as required to hold in place. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3. | Cut relief notches into the sides of the flashing and fold over and down the ends. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 4. | Flash joists, ledgers and blocking members. | |||||||||||||||||||||||||||||||||||||||||||||||||
| 3.4 | PROTECTION | |||||||||||||||||||||||||||||||||||||||||||||||||
| A. | Protect installed products until completion of project. | |||||||||||||||||||||||||||||||||||||||||||||||||
| B. | Touch-up, repair or replace damaged products before Substantial Completion. | |||||||||||||||||||||||||||||||||||||||||||||||||