Concrete formwork constitutes a large percentage of in-place concrete cost. Flat concrete voided slabs simplify formwork by eliminating beams and the labor required to form them. The time savings created by the use of voided flat slabs, with their simplified formwork, clearly have a beneficial impact by improving project schedules.
Simplifies forming
Faster framing cycles without beams
System use is simple and highly reliable
